is the The date for the Optimizer to run. The actual Optimizer that runs will depend on which Optimizer horizon the supplied Date falls within: If the supplied Date is inside the TWP, the Optimizer for the TWP will be run (which will include any non-working days). If the supplied Date is outside the TWP, it will be run for that day and no other, even if it’s a non-working day. |